Skip to content
Hansen Homes — New Construction (Cape Coral)

New Construction

Hansen Homes — New Construction (Cape Coral)

C&S Plumbing is the underground plumbing partner for Hansen Homes' newest Cape Coral build.

Underground rough-in is complete — supply lines, drain/waste/vent piping, and stub-outs installed and inspected before the slab pour. We'll be back for the in-wall rough and trim phases as the build progresses. This page will be updated with photos from each phase as work continues.

Timeline
In Progress
Cost
On Request
Location
Cape Coral, FL
Photos
8

Underground8 photos

Below-slab drain, waste, vent, and supply piping installed and pressure-tested before the concrete pour. Drone aerials show the full lot and slab layout before pour.

Photo 01 / 08

  • Drone view of mini excavator cutting underground plumbing trenches inside the block stem wall before the slab pour
  • Top-down aerial of stem wall footprint with sewer trench lines and PVC stub-ups being set in Cape Coral
  • Street-side drone view of C&S Plumbing service truck at a Hansen Homes lot with block stem wall behind
  • Low aerial from the street of plumbing and builder trucks at the lot with a mini excavator behind
  • Wide drone view of the L-shaped block stem wall and underground trench layout with neighboring homes beyond
  • Close aerial of underground DWV trench with white PVC stub-ups and fittings inside the stem wall before backfill
  • Straight-down aerial of the full Cape Coral lot showing stem wall outline and plumbing trench lines between neighbors
  • Overhead drone view of the block stem wall with underground sewer trench crossing the future slab

Ready to Get Started?

Whether it's an emergency or a planned project, our team is ready to deliver the quality and reliability that's made us Southwest Florida's most trusted plumbing company.

Free estimates · No hidden fees · Satisfaction guaranteed

CallTextRequest