Skip to content
Red PEX hot water lines strapped down block-wall furring and run through a framed island knee wall

For builders & GCs · Lehigh Acres, FL

New Construction Plumbing in Lehigh Acres, FL

9,500+ new construction homes plumbed since 1998. Lehigh Acres is one of the busiest scattered-lot markets in Lee County.

Lehigh Acres site conditions

What changes the plumbing in Lehigh Acres

We have documented slab-to-rough builds here, and production schedules are where phase-by-phase coordination pays off.

Permits and inspections in Lehigh Acres: Lee County (Lehigh Acres is unincorporated).

  • Well and septic vs. utility service

    Many Lehigh lots are on private well and septic, others on utility water and sewer. Which one a lot has changes the hookup scope, so we confirm it at bid.

  • Lee County permitting

    Lehigh Acres is unincorporated, so building and plumbing permits and inspections run through Lee County.

Scope by phase

Slab to final, one plumbing sub

What we do in each phase, what we need on site before we show up, and which inspection closes it out.

Phase schedules are coordinated with your superintendent based on project scope, site readiness, material availability, and inspection scheduling.

  1. Plumber setting PVC drain lines and vertical stub-ups in open trenches ahead of the slab pour

    Phase 1

    Underground / slab layout

    Below-slab drain, waste and vent laid to plan, stubbed up and tested before the pour.

    What we do and what we need

    What we do

    • Fixture layout checked against architectural plans and stub locations marked
    • Below-slab DWV trenched, bedded and sloped to plan
    • Stub-ups set for every floor fixture and the building drain
    • Water service sleeves and slab penetrations
    • Test and underground inspection before the pour

    What we need from the framer / GC

    • Pad graded and compacted to plan elevation
    • Stem wall or forms set and lot corners staked
    • Current approved plans with final fixture locations
    • Pour date, so inspection is passed ahead of it

    Underground plumbing inspection before the slab is poured

  2. PVC vent stack rising through a framed partition wall with stud protector plates and a PEX supply riser

    Phase 2

    2nd rough / top-out

    In-wall supply and DWV, vents through the roof, tub and valve rough-in.

    What we do and what we need

    What we do

    • Water distribution run to every fixture location
    • In-wall drain and vent piping; vents through the roof
    • Tubs and shower valves set
    • Water heater location roughed in
    • Test and rough (top-out) inspection before insulation and drywall

    What we need from the framer / GC

    • Framing complete and trusses set
    • Roof dried in (vent penetrations)
    • Tubs, shower pans and valve selections on site
    • Water heater type and location confirmed

    Rough-in / top-out inspection before insulation and drywall

  3. Brushed nickel shower head and single-handle valve trim in a marble-look tile shower with blue glass mosaic band

    Phase 3

    Trim / set-out

    Fixtures, faucets, appliances and water heater set; system started up.

    What we do and what we need

    What we do

    • Toilets, sinks, faucets and shower trim set
    • Dishwasher, disposal and ice-maker connections
    • Water heater set and started
    • Leak check at every connection

    What we need from the framer / GC

    • Cabinets and countertops installed
    • Tile and paint complete in wet areas
    • Fixture package on site (if builder-supplied)
    • Appliances delivered

    Carried into the final plumbing inspection

  4. Phase 4

    Water & sewer hookup

    Service line from the meter and building sewer to the tap, or septic where there's no sewer.

    What we do and what we need

    What we do

    • Water service from meter to house
    • Building sewer to the utility connection
    • Cape Coral UEP water, irrigation and sewer connections
    • Irrigation tie-in where specified

    What we need from the framer / GC

    • Meter set / utility tap location confirmed
    • Sewer vs. septic determined for the lot
    • Clear path from house to connection point

    Service line and sewer connection inspections per jurisdiction

  5. Phase 5

    Final

    Final inspection passed and the house turned over with water on.

    What we do and what we need

    What we do

    • Final plumbing inspection called and attended
    • Punch items closed
    • Plumbing sign-off toward the certificate of occupancy

    What we need from the framer / GC

    • Other trades complete in wet areas
    • Water (and gas, if applicable) turned on
    • Final inspection window from your schedule

    Final plumbing inspection

Scheduling & coverage

Upcoming starts

Contact our estimating team to discuss upcoming starts, project volume, and scheduling availability.

Where we work

Southwest Florida, from Port Charlotte through Naples.

What your buyers get

We’re here long after construction is complete.

  • Homes and commercial properties

    Lifetime service discount

    Homes and commercial properties with new-construction plumbing completed by C&S qualify for a lifetime discount on future plumbing service.

  • New homes

    Complimentary first-year visit

    New homeowners also receive one complimentary water heater flush and whole-home plumbing inspection during their home’s first year. Call 833-PLUMB-IT ext. 0 within 12 months of home completion to request and schedule your complimentary visit.

Request your visit: 833-PLUMB-IT ext. 0

Customer benefits are separate from warranty terms.

Submit Lehigh Acres plans for a bid

Plans (PDF, JPG or PNG)

PDF, JPG, PNG · Up to 10 files · 4 MB total

Need to add scope notes, budget or square footage? Use the full Builder Portal.

Need our license, COI or W-9 first? See the prequal packet.

What happens after you submit

FAQ

Lehigh Acres new construction questions

Who pulls the plumbing permit for new construction in Lehigh Acres?

We do. Plumbing permits are pulled under our Florida Certified Plumbing Contractor license (CFC1432485 / CFC057076) through Lee County, and we call each phase inspection.

What phases does C&S handle?

All of them: underground / slab layout, 2nd rough (top-out), trim, water and sewer hookup, and final. You can hire us for the whole house or specific phases.

How do I get a bid for a Lehigh Acres project?

Send plans through the bid form on this page with your community, number of units and target start date. Our estimating team returns a written scope and price.

CallTextBook