New Construction Plumbing in Punta Gorda, FL
9,500+ new construction homes plumbed since 1998. We've documented new construction and commercial plumbing in Punta Gorda, from ground-up homes to airport hangar work, and we take on builder work across Charlotte County.
Punta Gorda site conditions
What changes the plumbing in Punta Gorda
Permits and inspections in Punta Gorda: the City of Punta Gorda Building Division.
City of Punta Gorda permitting
Inside city limits, permits and inspections run through the City of Punta Gorda Building Division rather than Charlotte County.
Canal and waterfront lots
Punta Gorda Isles and Burnt Store Isles are canal communities, with the same shallow-groundwater considerations below slab as Cape Coral.
Scope by phase
Slab to final, one plumbing sub
What we do in each phase, what we need on site before we show up, and which inspection closes it out.
Phase schedules are coordinated with your superintendent based on project scope, site readiness, material availability, and inspection scheduling.

Phase 1
Underground / slab layout
Below-slab drain, waste and vent laid to plan, stubbed up and tested before the pour.
What we do and what we need
What we do
- Fixture layout checked against architectural plans and stub locations marked
- Below-slab DWV trenched, bedded and sloped to plan
- Stub-ups set for every floor fixture and the building drain
- Water service sleeves and slab penetrations
- Test and underground inspection before the pour
What we need from the framer / GC
- Pad graded and compacted to plan elevation
- Stem wall or forms set and lot corners staked
- Current approved plans with final fixture locations
- Pour date, so inspection is passed ahead of it
Underground plumbing inspection before the slab is poured

Phase 2
2nd rough / top-out
In-wall supply and DWV, vents through the roof, tub and valve rough-in.
What we do and what we need
What we do
- Water distribution run to every fixture location
- In-wall drain and vent piping; vents through the roof
- Tubs and shower valves set
- Water heater location roughed in
- Test and rough (top-out) inspection before insulation and drywall
What we need from the framer / GC
- Framing complete and trusses set
- Roof dried in (vent penetrations)
- Tubs, shower pans and valve selections on site
- Water heater type and location confirmed
Rough-in / top-out inspection before insulation and drywall

Phase 3
Trim / set-out
Fixtures, faucets, appliances and water heater set; system started up.
What we do and what we need
What we do
- Toilets, sinks, faucets and shower trim set
- Dishwasher, disposal and ice-maker connections
- Water heater set and started
- Leak check at every connection
What we need from the framer / GC
- Cabinets and countertops installed
- Tile and paint complete in wet areas
- Fixture package on site (if builder-supplied)
- Appliances delivered
Carried into the final plumbing inspection
Phase 4
Water & sewer hookup
Service line from the meter and building sewer to the tap, or septic where there's no sewer.
What we do and what we need
What we do
- Water service from meter to house
- Building sewer to the utility connection
- Cape Coral UEP water, irrigation and sewer connections
- Irrigation tie-in where specified
What we need from the framer / GC
- Meter set / utility tap location confirmed
- Sewer vs. septic determined for the lot
- Clear path from house to connection point
Service line and sewer connection inspections per jurisdiction
Phase 5
Final
Final inspection passed and the house turned over with water on.
What we do and what we need
What we do
- Final plumbing inspection called and attended
- Punch items closed
- Plumbing sign-off toward the certificate of occupancy
What we need from the framer / GC
- Other trades complete in wet areas
- Water (and gas, if applicable) turned on
- Final inspection window from your schedule
Final plumbing inspection
Documented builds
Our work in Punta Gorda
Jobs we've photographed phase by phase in Punta Gorda.
Scheduling & coverage
Upcoming starts
Contact our estimating team to discuss upcoming starts, project volume, and scheduling availability.
Where we work
- Southwest Florida, from Port Charlotte through Naples.
Talk to estimating
- 833-PLUMB-IT ext. 0 · office@csplumbinglee.com, or send plans for a bid.
What your buyers get
We’re here long after construction is complete.
Lifetime service discount
Homes and commercial properties with new-construction plumbing completed by C&S qualify for a lifetime discount on future plumbing service.
Complimentary first-year visit
New homeowners also receive one complimentary water heater flush and whole-home plumbing inspection during their home’s first year. Call 833-PLUMB-IT ext. 0 within 12 months of home completion to request and schedule your complimentary visit.
Request your visit: 833-PLUMB-IT ext. 0
Customer benefits are separate from warranty terms.
Need our license, COI or W-9 first? See the prequal packet.
What happens after you submit
FAQ
Punta Gorda new construction questions
Who pulls the plumbing permit for new construction in Punta Gorda?
We do. Plumbing permits are pulled under our Florida Certified Plumbing Contractor license (CFC1432485 / CFC057076) through the City of Punta Gorda, and we call each phase inspection.
What phases does C&S handle?
All of them: underground / slab layout, 2nd rough (top-out), trim, water and sewer hookup, and final. You can hire us for the whole house or specific phases.
How do I get a bid for a Punta Gorda project?
Send plans through the bid form on this page with your community, number of units and target start date. Our estimating team returns a written scope and price.