C&S Plumbing was the commercial plumbing contractor for Hangar 97, a new-construction aviation hangar at Punta Gorda Airport (PGD) built by Stellar Development.

Below-slab underground rough-in — supply, drain, waste, and vent piping set and inspected before the pour — the second rough-in through the commercial structure, and the fixture trim-out are documented below. Estimated and project-managed in-house by the C&S office.

Case study

How we approached this project

Scope of work

  • Underground DWV and supply rough-in
  • Second rough-in
  • Fixture trim-out
  • Commercial new construction
Client
Stellar Development
Timeline
Completed
Cost
On Request
Location
Punta Gorda, FL
Photos
75

Phase 1 of 3

Underground

Below-slab supply, drain, waste, and vent piping installed and inspected ahead of the slab pour for the new hangar.

Photo 01 / 22

  • Trench drain channel with plywood cover set in the sandy trench, mini excavator parked behind
  • Trench drain run leveled in the open trench ahead of the slab pour at Hangar 97, Punta Gorda
  • Plumber setting PVC sewer pipe in a deep below-slab trench at the Punta Gorda Airport hangar site
  • Trench drain line set across the graded building pad with the airport runway fence behind
  • Staked and taped building pad before underground rough-in, airliner taxiing beyond the airport fence
  • Close view of trench drain leveling rods set in concrete pads under the plywood-covered channel
  • PVC drain line and elbow tied into the trench drain outlet in the open trench at Hangar 97
  • Plumber taping the trench drain end cap and outlet fitting in the trench before backfill
  • Trench drain run supported on leveling rods in concrete, looking down the trench toward the site entrance
  • Plumber dry-fitting PVC DWV wyes and combos for the underground sanitary layout at Hangar 97
  • Slab edge forms staked along the trench line ahead of the pour at the Punta Gorda Airport hangar
  • Trench drain set to grade on the compacted pad with the airport fence and taxiway beyond
  • Crew laying PVC sewer pipe in the trench, seen from the excavator cab with the airfield behind
  • Single PVC DWV line bedded on the trench bottom with bell coupling before backfill
  • PVC sewer line in the trench joined with a rubber coupling, excavator bucket above at Hangar 97
  • Shielded rubber coupling joining PVC sewer pipe to an elbow in the site trench
  • Copper water service riser with ball valve feeding the backflow preventer, PVC sleeves around the pit
  • Backflow preventer assembly on copper riser with brass ball valve at the Hangar 97 water service
  • Plumber setting PVC drain line and wye fittings in a sand trench with a mini excavator working behind
  • Two crew members setting a long trench drain section on the graded hangar pad beside the airport fence
  • PVC drain line and stub-up in an open trench at the formed slab edge, with the graded hangar pad beyond
  • Staked hangar site before the slab, with an airliner taxiing past on the airfield behind

Phase 2 of 3

Second Rough

In-wall and overhead rough-in — water supply, DWV, and fixture stub-outs run throughout the commercial structure.

Photo 01 / 44

  • Steel stud office framing inside the pre-engineered metal hangar with CPVC supply runs along the top track
  • Overhead CPVC water lines run above steel stud framing beside spiral duct in the hangar office wing
  • Hot, cold and recirculation CPVC lines dropping down a steel column with the Punta Gorda runway beyond
  • CPVC supply lines strapped along the top of steel stud framing under the hangar roof purlins
  • Three CPVC risers clamped to a steel column beside the hangar door opening
  • Plumber on a scissor lift running overhead PVC and PEX through steel studs, vent risers at Hangar 97
  • PVC DWV vent lines and CPVC supply threaded through steel studs above red and blue PEX distribution
  • Overhead CPVC supply runs hung along the corridor beside the sprinkler main and PEX branches
  • Steel stud partition with wood header and overhead CPVC runs in the hangar office build-out
  • View from the hangar roof edge over the job site toward the Punta Gorda Airport apron
  • Hangar roof deck and open door seen through the mezzanine window, runway beyond
  • Airport control tower rising behind trees next to the Hangar 97 site
  • Crew member on the standing-seam metal roof facing the airport control tower
  • Corridor ceiling with CPVC supply on hangers, PVC vent, sprinkler main and firestopped wall penetrations
  • Capped hot and cold supply stub-outs and a drain stub through drywall for a lavatory rough-in
  • Hydrostatic test gauge manifold with hot and cold valves mounted on the metal wall panel
  • PVC vent piping with elbows run across the mezzanine deck beside the exhaust duct
  • PVC line with drops along the mezzanine edge against the hangar insulation
  • CPVC lines on hangers turning down through firestopped drywall penetrations at the ceiling
  • Single pipe drop through a firestopped ceiling penetration next to bundled MC cable
  • PVC vent elbow firestopped through the wall top beside CPVC line and exhaust duct
  • CPVC riser strapped to the finished wall beside the grooved sprinkler riser at Hangar 97
  • Overhead PVC water main with CPVC branch and ball valve, blue PEX and firestopped wall penetrations
  • Water line sleeved through a firestopped wall penetration above the electrical panel
  • PVC water line dropped down the electrical room wall with three stub-outs, panels alongside
  • Corridor ceiling run of CPVC supply, PVC vent and sprinkler main with braided flex drop
  • Overhead PVC DWV run and CPVC supply hung along the corridor beside spiral duct at Hangar 97
  • Plumber on a ladder finishing overhead corridor piping near the sprinkler main
  • Restroom rough-in with PVC DWV stack, wall-hung fixture carrier, PEX supply and copper stub-outs at Hangar 97
  • Lavatory carrier with 3-inch PVC DWV riser and red and blue PEX feeding copper stub-outs
  • Open hangar bay under the pre-engineered steel frame with the door raised toward the airfield
  • Steel stud restroom wall with PVC DWV vent risers, PEX branches and copper stub-outs, cleanout in slab
  • Wall-hung fixture carrier with 2-inch PVC DWV riser and PEX supply to copper stub-outs
  • PEX hot and cold lines through steel studs to copper stub-outs, closet flange in the slab
  • Three CPVC lines clipped along the steel girt behind the hangar wall panel
  • Plenum-rated CPVC supply lines clamped in the tight chase between wall panel and insulation
  • Plumber on a scissor lift working overhead CPVC and PVC in the corridor at Hangar 97
  • Drywalled restroom with closet flange, floor drain and capped lavatory stub-outs awaiting trim
  • Long drywalled wall with electrical boxes in the hangar office wing, overhead piping beyond
  • Restroom at drywall stage with lavatory stub-outs, closet flange and floor drain in the slab
  • Empty hangar bay with the hangar door open toward the Punta Gorda Airport runway
  • Plumber connecting a slab stub-out at the wall base with copper coil and tools staged
  • C&S plumber on the hangar's standing-seam metal roof with the Punta Gorda Airport control tower beyond
  • Inside the hangar shell before finishes, looking out the open hangar door to the airfield as roof insulation goes in overhead

Phase 3 of 3

Trim-Out

Restroom fixtures, the hangar-bay drinking fountain, utility sink, emergency shower and eyewash station, and the water heater set and connected.

Photo 01 / 09

  • Fixture wall in the hangar bay: bi-level drinking fountain with bottle filler, stainless utility sink, mop basin, hose bibbs and a yellow emergency shower and eyewash station
  • Electric tank water heater on a raised pad with copper piping, an expansion tank above and a recirculation pump at the base
  • Stainless drop-in sink with water running from a gooseneck faucet, set in a granite countertop over blue cabinets
  • Accessible restroom with a floor-mounted flush-valve toilet, grab bars, a wall-hung sink and a floor drain
  • Wall-hung sink and flush-valve toilet with grab bars in a finished hangar restroom
  • Flush-valve toilet beside a wall-hung sink with its trap and supply stops connected
  • Second restroom with a wall-hung sink, flush-valve toilet, grab bars and a floor drain
  • Trench drain grate running down the center of the coated hangar floor
  • Two C&S plumbers giving a thumbs-up beside the finished drinking fountain, utility sink and emergency shower

Builder case study

The job at a glance

Location
Punta Gorda, FL
Project type
Commercial aviation hangar, new construction
Phases performed
Underground → Second rough → Trim-out
Estimating & PM
Estimated and project-managed in-house by the C&S office