South Florida Christian Academy — K-1 Bathroom Remodel

Commercial Remodel

South Florida Christian Academy — K-1 Bathroom Remodel

C&S Plumbing was the plumbing contractor on a K-1 bathroom remodel at South Florida Christian Academy in Fort Myers, built by McDaniel Construction.

C&S demolished the existing fixtures and piping, then made the drain and supply connections for the new sink counters and faucets. Photos below run from the restrooms before the remodel through demolition, rough-in and the finished rooms.

Case study

How we approached this project

Scope of work

  • Plumbing demolition
  • Sink drain and supply connections
  • Fixture trim-out
  • Commercial bathroom remodel
Client
McDaniel Construction
Timeline
Completed
Cost
On Request
Location
Fort Myers, FL
Photos
22

Phase 1 of 4

Before

The original K-1 restroom sink counters before demolition.

Photo 01 / 02

  • Original blue cultured-marble counter with five built-in sink bowls and two-handle faucets, step stools underneath, before the remodel
  • Close view of the original blue sink counter and faucets along the mirror wall before demolition

Phase 2 of 4

Demolition

Existing fixtures and plumbing demolished to prep the K-1 bathrooms for the remodel.

Photo 01 / 13

  • PVC riser with a brass hose connection and blue-handled ball valve at the base of an exterior wall
  • Four closet flanges taped off and angle stops left on the wall after the toilets were pulled
  • Row of taped closet flanges and capped supply stops in the demoed school restroom stalls
  • Four-bowl cultured marble lavatory top with faucets and drain fittings pulled ahead of counter removal
  • Cultured marble lav bowls with faucet holes and tailpiece openings exposed after fixture demo
  • Capped lavatory supply stubs along the wall under the counter after the faucets were disconnected
  • Capped supply stubs under the lav counter apron with old adhesive beads on the wood support
  • Taped closet flange and wall-hung lavatory carrier arms with supply stops in a demoed accessible restroom
  • Eight taped closet flanges and capped angle stops in a row after the school toilets were pulled
  • Gutted school restroom with taped closet flanges, stacked partitions and a cart of demo debris
  • Long multi-bowl cultured marble lav counter stripped of faucets and drains with demo cart alongside
  • PVC supply line dropping to a brass stub with shutoff in a dirty concrete chase
  • Old brass gate valve on a painted PVC supply stub in a concrete chase during the bathroom demo

Phase 3 of 4

Rough-In

Drain and supply connections made under the new sink counters.

Photo 01 / 02

  • Sealant being run along a taped joint where the new white sink top meets the mirror
  • Two C&S plumbers connecting drain traps and supplies under the new sink counter

Phase 4 of 4

Final

Finished restrooms with the new sink counters and touch-free faucets in service.

Photo 01 / 05

  • Finished K-1 restroom with a long white counter of integral sinks and touch-free faucets, toilet stalls reflected in the mirror
  • New white sink counter with touch-free faucets and wall-mounted soap and towel dispensers
  • Close view down the new sink counter showing the rectangular integral bowls and touch-free faucets
  • Two new sink counters facing each other across the remodeled restroom, with a floor drain between them
  • Single integral sink with a touch-free faucet at the end of the new counter, a child's step stool below